ABSTRACTED FROM DRAFT v3.0

Uinsure Digital Factory – Manufacturing Line

Every initiative flows through three macro phases: first we Shape the idea into a viable, prioritised proposition (30 mins → days); then we Build it in disciplined sprints with full design up-front (weeks); finally we Ship & Prove value back to the business (hours → ongoing). Two capacity gates act as quality checkpoints — nothing enters the next phase until it's ready and capacity exists.

Filter by work type →
📋 All Work Types
Show complete 9-stage flow
⚡ Small Change & Feature Requests
Starts at Discovery · Single squad · No Phase 1
🔧 Supporting Live Systems
Build & Release only · No pipeline stages
🔩 Technical Debt Reduction
No Phase 1 · No Gates · No UAT
Phase 1
Shape
"Is this worth building, and when?"
⏱ 30 mins + 5 days + 1 gate meeting
01 Idea 02 Feasibility 🔒 Gate 1
What comes out
Business Solution Concept with T-shirt sizing
Risk flags & high-level dependencies identified
Roadmap allocation & programme lead assigned
Who drives this
A Pre-Sales R Rel. Mgr A Exec Sponsor
Phase 2
Build
"Design it right, then manufacture it."
⏱ Weeks of Discovery + Sprint cycles + 1 gate
04 Discovery 🔒 Gate 2 06 Build & Test
What comes out
Full BRD, solution blueprint & user stories in Jira
Baselined scope with post-discovery estimates
Working, tested software with demos
Who drives this
A Engineering A Product L Delivery
Phase 3
Ship & Prove
"Validate, deploy, and prove value."
⏱ 1–2 weeks UAT + hours deploy + ongoing
07 UAT 08 Release 09 Operate
What comes out
Business sign-off with acceptance criteria met
Smoke-tested deployment, live in production
Value metrics vs. baseline & lessons learned
Who drives this
A Delivery A Exec Sponsor R Bus. Stakeholder
Phase:
All 9 Stages – Complete Manufacturing Line
Full Demand-to-Value flow · Scroll horizontally

Role Definitions

All roles derived from RACI assignments across the 9 stages. Click any role for the full spec.